Quarry Stone Crusher Building

This section will show the build up of the stone crusher building. It's based on an article in the November 1957 issue of Model Railroader.

Half way up.


Almost done.


Next the window and door openings
had to be covered for the next operation.


Once covered up the next operation is to fill the in the motar.


Next, plaster was spread over the blocks with a fan tail brush.


Once the mortar lines were filled in water
was misted over the plaster to wet the plaster.


The finished block structure of the rock crusher building.


Next will be the upper structure
of the rock crusher building.